| 411Building (former Farm & Home Savings building) 411 N. Tenth St. Mixed-use redevelopment of the six story building at the corner of 10th & Locust, previously known as The Farm & Home Building. The redevelopment is to include retail on the first floor and office space on floors 2-6. Each floor is approximately 10,000 square feet. LEED certified Gold. Cost: $13.2 million Developer: Loftworks District: Washington Avenue / Garment Status: Open Website: www.loftworks-stl.com | |
| City Garden Gateway Mall between 8th St. and 10th St.
A unique 2.9 acre sculpture and landscape public garden on the Gateway Mall. The garden will include three impressive water features, a café overlooking the garden, an eight-foot limestone wall, and a state-of-the-art LED video wall. Cost: $20.0 million District: Civic Center Developer: City of St. Louis and Gateway Foundation Status: Open | |
| Federal Reserve Bank of St. Louis One Federal Reserve Bank Plaza, Broadway and Locust St.
Acquisition and remodeling of the former Marquette parking garage, demolition of existing parking garage and new construction of an outdoor plaza and a six-story, 100,000 square foot office addition and renovation of existing Federal Reserve Bank office building. Cost: $75.0 million Developer: Federal Reserve Bank District: Central Business District Status: Open Website: www.stlouisfed.org | |
| Hyatt Regency St. Louis Riverfront315 Chestnut St. The 910 room former Adam's Mark hotel (a combination of the former Pierce Building, built in 1907 and new hotel construction in 1984) is being completely renovated and re-flagged as the Hyatt Regency Riverfront. Cost: $63.0 million Developer: Chartres Lodging Group District: Central Business District Status: Completed Website: http://stlouisriverfront.hyatt.com | |
| Justice Center Garage Corner of Tucker Blvd. & Clark Ave.
The new 192,000 square foot Justice Center Garage will have over 500 parking spaces with 10,000 square feet of ground-level retail. Cost: $16.0 million Developer: City of St. Louis District: Civic Center Status: Open | |
New Mississippi River Bridge One mile north of the Martin Luther King Bridge
A new, 4-lane, I-70 Mississippi River Bridge with design accommodations for a companion bridge to be built in the future. Project also includes a partial interchange with existing I-70 near Cass Avenue. Cost: $640.0 million Developer: Illinois and Missouri Departments of Transportation District: Columbus Square Status: In development Website: www.newriverbridge.org | |
Park Pacific
1226 Olive St.
Redevelopment of the 22-story, 470,000 square foot former Missouri Pacific/Union Pacific building, built in 1928. The renovation will include: 203 apartments, 51,000 square feet of office space and 10,000 square feet of street-level retail. Cost: $109.0 million Developer: Lawrence Group District: Civic Center Status: Opening 2011 Website: www.parkpacificstl.com |  |
| Riverview Park at Laclede Power O'Fallon St. and Lewis St.
The new park, situated on a hill at the downtown entrance to the Riverfront Trail, will provide spectacular views of the Mississippi River and will feature an outdoor amphitheater, turtle sculpture by Bob Cassilly and water features evocative of the Great Rivers. Cost: $650,000 Developer: Trailnet District: Riverside North Status: Now Open Website: www.trailnet.org | |
Roberts Tower
411 8th Street
New construction of a 25-story condo tower, attached to the existing Roberts Mayfair Hotel, that will house 55 luxury condos and an upscale restaurant. Cost: $70.0 million Developer: Roberts Companies District: Central Business District (Post Office Square) Status: Opening 2010 Website: www.robertstower.com | |